Raise a house and build under ideal home example

Raise a House and Build Under; why and how?

You own a house and you’re thinking, 'we could raise and build under'. But you’re also wondering: 'is our house more valuable as it is? What do we need to consider? What are the options? What’s the best value proposition?' There’s much to consider, so let's go …

in this post:

Why raise a house and build under?

Because there are just SO MANY Benefits:

  • You get the extra space you need without moving AND by moving the kitchen, dining and lounge downstairs the space upstairs can be given over to master bedroom enhancements (walk in robe, ensuite etc) or a second living room.
  • It’s an opportunity to raise your ground level above predicted higher flood levels.
  • You get a structural upgrade with the ground floor complying with modern footing and framing standards.
  • It’s an opportunity to clear out old, under-engineered footings.
  • Upstairs you can have a structural upgrade to combat extreme weather events and cyclones (which are predicted to become more frequent).
  • You could access more light, views and breezes – a transformation without moving suburb.
  • You can increase the value of your home with a top-to-bottom makeover.
  • It’s an opportunity to improve the liveability of your home with a more accessible layout, more storage and internal stairs. 
  • You can include a built-in double garage.
  • When raising you could re-position the house or re-orientate it on the lot, taking advantage of any privacy, views, breezes, or for many other reasons. A registered building designer can advise you on that.
  • The lower level of most older high-set houses was never intended for habitation. Despite the previous owner’s renovations, it’s likely never been approved for habitation. These houses are ideal candidates for being raised and built-under. Why? Because the entire lower level is replaced, and you can sell the house a legally habitable ground floor.
  • You re-use the existing house AND get a new modern level downstairs AND you get to keep the backyard. The best part is showing your friends!

How; the challenges of house raising and building in under

When you raise a house and build under, there can be some challenges:

Cost Most additions and renovations cost several hundred thousand dollars. A house raising, being a combination of a new build, an addition and a renovation, is going to be a substantial cost so you need to:

  1. consider if it’s within your budget, and
  2. whether or not you’re overcapitalising, and does that matter to you? We talk about cost later in this post.

Regulatory Changes There will have been regulatory changes since the original house was built. These will add cost but come with benefits. Just be ready to accept the benefits and move on.

To Stay or Go If you’re living in the house, can you tolerate the disruption the construction process will cause, for the time it will take? Should you move out for a short time, or a long time, and can you budget for that?

The Unexpected Renovations often uncover problems which have remained hidden or forgotten:

  1. Underground services in inconvenient places.
  2. Buried construction, buried swimming pool, abandoned footings, deep fill, mine workings.
  3. Termite damage.
  4. Underground water table.
  5. Lot boundaries not where they were assumed to be.

But there are solutions so don’t worry yet, an experienced Building Designer or Architect will know what to do

Design Challenges When working with existing layouts, getting the best orientation and location for rooms whilst juggling structure, flow, aesthetics can be more challenging than for a new house on a vacant lot.

Approval Process The approval process is straightforward, once all the competing needs are met.
A house raise can trigger a compulsory upgrade to current rules for the existing house, but this can be tempered by what is reasonable and practical. For instance you can’t upgrade the insulation in the existing walls if you are not re-lining or re-cladding, but you can add insulation over the ceiling.

On some sites you may want to dig down instead of raising to make the approval process easier if raising could trigger an inconvenient town planning rule to do with boundary offsets or height.

Renovate Gradually? A raise is a chance to fix up niggling issues with the existing house:

  1. A second toilet or a toilet outside the bathroom.
  2. A parent only bathroom.
  3. More privacy.
  4. More separation from noise.
  5. More separation from stay-at-home offspring or long term guests.
  6. Better car accommodation.
  7. Make space for a future lift if you think you might ‘age in place‘ rather than downsizing.

Best layouts for a house raise and build under

Classic Layout or Something Else?
Typically the best plans to raise a house and build under involve the use of the lower level for a new:
• kitchen • dining room • lounge • patio • pool area • home office • garage, while the upper level is retained as a dormitory area with bedrooms and a bathroom or two. An internal staircase is a given.

Should the site dictate it, you may want to switch the layout so the main living area is upstairs to take advantage of any views, breezes or for easier access if you’re on a sloping lot.

As mentioned above, leaving the house where it is and digging down to make a new lower level may be best for you. There is always the need to ensure the water can drain away, so level becomes very important to your designer and you should definitely get advice before deciding anything.

What are the stages of a house raising?

Planning, Design and Approvals Talk to your experienced Building Designer or Architect for advice. They may also need help and advice from a Town Planner and a Building Certifier to confirm what is possible and to help navigate the approvals process.

A raise a house and build under project can be staged, with future stages accommodated. For instance, placing and building-in the future plumbing and drainage and power into the new slab with walls to be added later or positioning stairs in their future location. Your designer will provide you with a master plan so that the process is as efficient as possible and without unnecessary do-overs.

Your Building Designer or Architect will Adjust the Layout so that new columns are located out of sight inside walls as much as possible. Usually some existing columns will be deleted or moved, and new columns placed with steel beams used to increase the span of existing bearers, compensating for the loss of support.

Your Designer with the Builder and/or House Raising Company will assess the site to ensure a Safe Raise Temporary steel beams will be supported on raising blocks to support the house while existing columns or stumps are removed. New steel beams are bolted to the side of bearers ready for the next stage. The house is then raised.

Check with your Insurance Company and the House Raising Company to agree who is insuring the house during raising and construction work.

Typically, after raising, the house will be supported on new steel columns attached to the underside of the house in their new locations. The columns are then cast into new footings and the columns cross braced before the shoring is removed and the house stands by itself. The services are then reconnected.

Check with your House Raising Company how far they go before finishing up on site and what you can expect. For example; will they leave with the house braced on new stumps ready for someone else to organise the reconnection of stairs and services and level the site? Some homeowners will pause here, lay a laundry slab and park the cars on gravel under the house and leave it that way until they can afford the next stage.

This is why, when you hear people talking about the cost of raising a house, the dollar values vary considerably. Ask yourself how many of the following will you be paying for, and what you will be doing yourself. Consider the list below.

Looking ahead

  1. Carry out any additional works such as swimming pools, cut/fill excavation and retaining walls now, while you have easy access.
  2. House will be raised and fixed onto new, braced stumps.
  3. Services will be reconnected.
  4. Stairs will be put in place.
  5. Excavation of the land to new levels to ensure drainage.
  6. Construction of retaining walls with waterproofing and drainage under the house.
  7. Installation of all services underground, ready for the next stage.
  8. Cast a new ground level slab with services pre-installed ready to be connected based on the future layout.
  9. Enclose the lower level with new walls.
  10. Cut the stairwell in floor the and install new stairs.
  11. Paint and fit out the interior.
  12. Modifications to the upper level, remove the kitchen and carry out any other renovations including adding a deck and extra bathrooms.
  13. Facelift the street facing façade of the existing house.
  14. Landscaping, drainage, paths, driveway, letter box, clothes drying line, garden edges, turf, new plants and feature tree/s, pergola, patio paving, bbq area fit-out …

How your newly-raised home could look

FAQ

Consider the following:

  • Extending by addition, or by rooms attached by a corridor is cheaper, but eats into backyard recreation space.
  • You’re more likely to be able to stay in your house during the build.
  • Raising is better if within your budget because you’ll gain height, retain the yard and replace the footings.

Yes, and it may be necessary if raising triggers current compliance requirements which can’t be met, or if raising inconvenience your plans:

  • It’s a similar process to raising with potential additional costs for excavation, retaining walls and drainage.
  • In some locations it may be your only option.
  • One end should be able to drain by gravity.
  • Underground on four sides is possible but drainage becomes much more problematic.

BTW, houses in North America have basements so the footings are below the frost line to avoid frost heave from freezing and thawing of ground water. In warmer climates basements are not as necessary and very expensive to keep dry.

Yes. Put it on a truck and move it wherever the truck can access safely.

Yes. Put it on a truck and move it wherever the truck can access safely.

Yes. Similar to moving the house, but without sitting the building on a truck.

Yes, but only AFTER doing your homework, checking that all your assumptions and costings are correct AND after securing all approvals and the subdivision. You will be talking to: Building Designer or Architect, a Town Planner, a Surveyor, a Certifier, the local Council, the owner of local service infrastructure.

Expect unanticipated costs, imposed costs and no-bid works by service providers.

Cost is the main reason. With enough steel beams and equipment all buildings can be raised, but a timber/steel frame on stumps with no masonry are best as the underside is easily accessed, weighs less and they are less brittle than a masonry veneer or a slab on ground house.

In rare cases, where designed to be removable, the steel frame part of a slab on ground can be moved or raised. Talk to a builder, Building Designer or Architect.

No. You will need to vacate the house while the raising and re-stumping takes place.

The services: power, water and drains will be disconnected while the house is raised. Talk to the house raising company about the minimum time you will need to be out.

Yes. With enough steel beams and equipment all buildings can be rotated, but a timber/steel frame on stumps with no masonry are best as the underside is easily accessed, weighs less and they are less brittle than a masonry veneer or a slab on ground house.

In rare cases, where designed to be removable, the steel frame part of a slab on ground can be rotated. Talk to a builder, Building Designer or Architect.

Where the current orientation is no longer suitable due to nearby development or road widening etc., rotating the house can improve thermal performance and street presence.

Yes, but as per rotating you house (above).

It depends how much work is being done. The lower price may be just the bare raise and 100% re-stump with nothing else. Site conditions, soil type, slope, amount of demolition, number of stumps not being replaced, size and complexity of the steel beams needed, what optional extras are included all play big role in price.

Planning, Design and Approvals:
Talk to your experienced Building Designer or Architect for advice. They may also need help and advice from a Town Planner and a Building Certifier to confirm what is possible and to help navigate the approvals process.

A house raise and build in under can be staged with future stages accommodated. For instance, placing and building-in the future plumbing, drainage and power into the new slab with walls to be added later, or positioning stairs in their future location. Your designer will provide you with a master plan so that the process is as efficient as possible and without unnecessary do overs.

Your Building Designer or Architect will adjust the layout so that new columns are located out of sight inside walls as much as possible.

Usually some existing columns will be deleted or moved, and new columns placed with steel beams used to increase the span of existing bearers, compensating for the loss of support.

Colin Roe is a Licensed Building Designer and BDQ Member based in Redcliffe, Moreton Bay.
Working directly with home owners, Colin creates meticulous custom building designs and plans.

share

Colin Roe Building Designer Logo

Colin Roe Building Designer Disclaimer:

The information available on this website, including text, graphics, images, and information, contained or available through this website, is general in nature; it may not apply to your circumstances and is not a substitute for obtaining site specific advice from building industry professionals.

Colin Roe Building Designer makes no representation and assumes no responsibility for the current accuracy of information contained on, or available through this website, or its suitability for any purpose, or your interpretation thereof. Such information is subject to change without notice.

You are encouraged to confirm any information obtained from or through the website with building industry professionals and review all information regarding your building project with Colin Roe Building Designer, your: Licenced Building Designer, Registered Architect, Qualified Town Planner, Licenced Land Surveyor, Engineer, Building Certifier or Local Government, as applicable, BEFORE making any financial commitments or other action.