The cost to get house plans drawn up falls into three broad categories:
- a new house plan on a cleared site
- house extension plans and/or house renovation plans
- a new secondary house or pavilion behind an existing house.
These are typically owner occupied or investor driven projects with minimal regulatory burden or barriers to approval.
Note that Colins’ fees are typically up to 1% lower than average
For an immediate cost estimate Call Colin or use our Contact Form
Flats, town houses and duplexes are considered a separate fee category to houses because they are typically more investor/developer driven, carry a heavier regulatory burden, and can easily be more challenging to design and gain approval.
We shall only address the three categories of house plans numbered above and located in the City of Moreton Bay. The City of Moreton Bay includes the bayside suburbs north of Brisbane, Australia: Redcliffe, Deception Bay, Beachmere, as well as Pine Rivers, Morayfield, Caboolture, Bribie Island, and areas west of these to the mountains.
The percentages given below do not include GST, consultants fees, or approval fees and were current for the City of Moreton Bay in 2025.
Cost to Get House Plans drawn up; Rules of Thumb
- The lower the construction cost, the higher the fee, as a % of that cost.
- Decks are expensive.
- New house plans are comparatively cheaper as a % of construction cost.
- Custom designs are more expensive and more likely to have time and cost overruns which are inherent to their one-of-a-kind nature.
- An off the shelf non-custom plan, re-used and evolved multiple times will always be cheaper because the development cost can be spread over many buyers.
- As a general rule, a designer, architect or draftsperson with double the experience will reduce the time taken by 80%.
- One-off projects are inherently more expensive than repetitive projects.
Note that in Queensland, a draftsperson can only work for another licensed professional and not for the public. Only Licensed Building Designers and Registered Architects can work with anyone.
How much does it cost to have plans drawn up for an extension?
Back of the envelope calculations
House extension plans and house renovation plans are the most expensive with the greatest range in project value compared to new house plans. Fees quoted are percentages of the total build cost and are for ‘back of the envelope’ calculations.
- Building Design fees for extensions and renovations range between 15% and 4.75% with most projects in the region of 7% of the cost of construction.
- Secondary dwelling plans (Granny Flats) and pavilions range between 13% and 7.25% with most projects costing about 7.75%.
- Custom house plans costs range between 4% and 2.7% with most projects being about 3.75%.
Due to low overheads Colin Roe Building Designer is up to 1% below the fees quoted above, depending on the type of project. For Colin’s typical costs for the drafting house plans, see the graph below.
Typical Fees Graph

Level of service is always a variable
The level of service your Building Designer is offering and the length of time they will be involved in the project has the biggest impact on fees. Make sure you check what’s included in your quote, using our checklist:
- concept development
- approvals management
- site specific design
- a high level of energy efficient design
- briefing and liaison with consultants
- taking additional time to think through details and come up with more refined solutions.
Custom house plans will cost more when they include the following:
- concept design cycles
- extensive owner involvement
- a high level of custom detailing
- research
- consultant involvement
- specification.
A set of plans drawn as dictated by the owner, rather than going through several concept design cycles, and leaving the Builder to fill in the blanks during construction will be cheaper.
A set of thoroughly considered house plans, evolved, custom detailed and with the designer liaising with consultants before, during and after construction will cost more.
There will always be someone offering lower cost house drafting plans, often based overseas. You should consider if the risk to your budget and timeline is something you can manage.
Why do building design fees cost so much?
Projects are rarely identical to one other, so fee calculations always contain some element of uncertainty, especially early on when a full understanding of the project has not emerged.
- Time must be spent on site measurement and documentation of existing structures.
- Briefing and liaison with consultants takes time, skill and experience.
- Compliance with current rules.
- Custom detailing for accurate builder quotes and construction.
What am I paying for?
- Greater certainty of budget and completion date.
- Better energy efficient design.
- Better siting.
- Consideration of your lifestyle.
- Others sharing the legal responsibility for the building.
Should something go wrong with, or at, a building site, the court looks at everybody’s liability including the owners. Paying adequately means your Building Designer will have time to think of, check and address every issue, resulting in good house plans so that everyone on site knows what to do. This prevents errors, do-overs on site, delays and cost.
Trades on site are often not aware of the latest changes and what they must do differently this time. House plans which spell out exactly what the tradie must do are well worth it when the Certifier comes to inspect the works.
What extras to budget for in your house plans
If your Building Designer needs information and advice from consultants before they can complete their work, your costs will increase and your completion date will push out.
The consultants listed below need to be briefed, and the quote accepted before there’s a delay while your report or reply is prepared.
Almost all projects need:
- copies of plans and documents from the council
- a certifier for approvals and inspections.
- a soil test and report
- a structural engineer and an energy assessor.
Sometimes you will also need:
- surveyor to document heights and locations in plan
- hydraulic engineer for uphill stormwater design or a performance solution report, bushfire assessor to calculate the bushfire attach level
- town planner where a development approval is needed before building approval, services locator to locate poorly documented underground services.
- acoustic engineer where site is subject to road or rail noise.
Your project may have unique challenges:
- underground services in inconvenient places
- easements burdening you
- town planning overlays
- design for flood
- heritage overlays
- poor access
- custom detailing
- extensive roof alterations
- changes to light and ventilation access
- shading of neighbours
- overlooking of neighbours
- materials research and sourcing
- multiple design revisions at owner’s request
- proposed works which are non-compliant resulting in back and forth negotiation with authorities
- Latent conditions, usually underlying rock but can be unusually soft soils needing more in ground structure.
Rural Lots
These commonly have many more overlays than a typical suburban house lot: bushfire, land slip, waterway offsets, native flora and fauna overlays, scenic amenity, noise corridors, vegetation protection. These all have to be addressed.
FAQ
Refer to the Typical Fees Graph above.
Around 5.5% for a $400,000 addition.
3.5% to 7.25% for a $600,000 build cost.
- Wet areas and kitchens.
- Steep sites with extensive excavation.
- Big structural items: deep footings, stiffer slabs, steel beams, retaining walls, drainage and waterproofing of below ground walls.
- Waiting while costs continue to rise.
It is usually worth paying a licensed trade to get it done fast and right the first time. Even if you have the grip and organising skills to run a project, you will still not have the experience.
- Getting to a clear idea of exactly what you want as soon as possible so your Building Designer can work in one clear direction with less possibility of revisions.
- Providing plans for the existing house and the surveyors lot plan early.
- Grouping the plumbing in one area.
- Avoiding: large spans with steel beams (except for house raising), rooms below ground level, retaining walls, deep cuts, steep sites, rural sites.
- Doing your own fixtures, fittings and finishes selection.
- Never cover or concrete over anything the Certifier needs to inspect before the inspection.
- Find out the real cost before you start and do not be in a hurry – expect delays.
- Get anything and everything – especially changes – in writing and signed by both parties. This should always include: extra time/less time, additional cost/cost reduction and a clear statement of what the “deal” is.